#12 |
(28-07-2024, 02:03 PM)Veggie Wrote: IF you were thinking of staggering them in height, I'd put one on top of the other alongside the tunnel with a path between........I’ve just had a Play with this . PT /2 pipes /path /1 pipe /PT.
Like this............PT,/2 pipes/path/2 pipes/PT.
Not sure that would work with the cradles though??
That works.
not quite enough space for 2 pipes either side.
I could cut the other half pipe into 1m lengths and probably do a teared stand.
Builder that would like to go play in the garden.