| #1,687 |
(This post was last modified: 30-01-2026, 11:23 PM by Small chilli.)
Most of today has been spent working out exactly where the tap for the bathroom sink are going. ( attaches to the wall not the sink ). This has involved a little bit of calculated guess work as far as thickness of floor tiles and cement bed they will be sat on. As we don’t have the tiles yet. Then we’ve had to build our bathroom cabinet that the sink sits on. Then go down the road to the polytunnel and retrieve the marble top that’s going to sit on the unit. Get unit, marble top and sink in exactly the right position. Then work out the hight and position of the tap above the sink. Then drill the two holes, one 50mm, one 37mm . Then mock it all up to make sure it’s right. We think so! Until it’s finally in we won’t know. Who knew drilling a couple of hole would take so long. We have to get all this sort of stuff sorted quickly. So we can finish plasterboarding. As the plasterer will be with us week after next.
Both sets of lights for the living room arrived today. So we have chosen which work best for our lampshade. There was a clear and instant winner.
Both sets of lights for the living room arrived today. So we have chosen which work best for our lampshade. There was a clear and instant winner.
Builder that would like to go play in the garden.

![[-]](https://gardenandgossip.org/images/zen/collapse.png)