| #1,609 |
That 95% of the 75mm sound proofing insulation done. Just a little bit more in the utility room to do. Either needs plumbing stuff done or can’t reach because stuff in the way. This is the dinning room
.
Still have most of the 50mm to put into the non structural walls. Which I’ll try tomorrow. But it might have to wait until there’s plaster board on one side.
Still have most of the 50mm to put into the non structural walls. Which I’ll try tomorrow. But it might have to wait until there’s plaster board on one side.
Builder that would like to go play in the garden.

![[-]](https://gardenandgossip.org/images/zen/collapse.png)