#1,578 |
A bit more done on the MVHR.
The last hole being drilled in the floor/ceiling
3 pipes to the left are fresh air going to living room, dining room , spare bedroom. 2 pipes to the right is hot air leaving the kitchen.
Living room & dining room finish here, spare bedroom carries on through the wall
Have one of these sticking through the ceiling in every room now .
The last hole being drilled in the floor/ceiling
3 pipes to the left are fresh air going to living room, dining room , spare bedroom. 2 pipes to the right is hot air leaving the kitchen.
Living room & dining room finish here, spare bedroom carries on through the wall
Have one of these sticking through the ceiling in every room now .
Builder that would like to go play in the garden.