#1,526 |
A lot of one step forward and two back today. Very annoying. But we got our first bit of plywood up in the shower. (All none structural walls in bathroom have to be lined with plywood. In the event handrails and such are even needed. And started sorting out shower drainage. Ordered lots of stuff as well
Builder that would like to go play in the garden.