#765 |
Re filled a few holes in the shed that I’d not done properly. Then me & Bob Readjusted the door because it wasn’t closing properly. Then we both re laid the slabs by the front gate. They were starting to sink into the mud. So we lifted them. Dug out a little more and dug a deep trench around the edge. Filled the trench with gravel from the beach. Put down a bed of sand and a weed membrane then the slabs were put back in place.
Builder that would like to go play in the garden.