#979 |
Started the makeover of the rockery and adjacent path. The rockery (loose term for a mound of soil and rocks riddled with montbretia and bindweed) lies between GH2 and GH3. The path runs along the base of the rockery parallel with the north side of GH1.
I want to make this path wider; lower the height of the rockery and create a path across it that connects GH 2 and 3, so that I don't need to come down from GH2 onto the main path and go back up into GH3.
So far, I've pulled up the plants between the rocks and the path and the log edging (acquired yesterday) has been hammered in to make a new edge a foot or so away. I need to move the rocks back about a foot and fill the space between the rocks and edging with the soil that I'll be removing to make the path between the GHs.
Still with me or did I lose you in the first paragraph?
I want to make this path wider; lower the height of the rockery and create a path across it that connects GH 2 and 3, so that I don't need to come down from GH2 onto the main path and go back up into GH3.
So far, I've pulled up the plants between the rocks and the path and the log edging (acquired yesterday) has been hammered in to make a new edge a foot or so away. I need to move the rocks back about a foot and fill the space between the rocks and edging with the soil that I'll be removing to make the path between the GHs.
Still with me or did I lose you in the first paragraph?
The Moneyless Chicken says:-
Use it up, wear it out, make it do or do without.
Use it up, wear it out, make it do or do without.