#234 |
It’s all turning to ****! It may be time to get the linch mob back together .
Bob posted some photos of our metal work on fb , because it’s not just you lot getting bombarded with build photos .
Someone got in contact with Bob saying it didn’t look right. Initially we just thought you cheeky **** ! Turns out after Bob having a very long chat. We’ve been working off the wrong drawings ! 1 , we don’t know any better. 2, that’s all we were sent . What we’ve been working off is frankly considered to be a little doodle to get a building warrant and not even ****ing close to being detailed enough to build off it!
If we’d continued as we were apparently our foundations would have cracked in several different places and for different reasons!!
So luckily we’re dealing with an incompetent quarry ( who knew that was a silver lining ) otherwise we might have poured concrete over poorly constructed and wrong size & configuration of metal work! So now Bob is trying to get hold of MD of the engineering firm to find out where the drawings we actually need are!
If they haven’t done them and try and wriggle out of it and we get the drawings done by someone else . It could take 3 weeks.
I don’t even want to think about the potential money we may or may not have wasted!!!
Bob posted some photos of our metal work on fb , because it’s not just you lot getting bombarded with build photos .
Someone got in contact with Bob saying it didn’t look right. Initially we just thought you cheeky **** ! Turns out after Bob having a very long chat. We’ve been working off the wrong drawings ! 1 , we don’t know any better. 2, that’s all we were sent . What we’ve been working off is frankly considered to be a little doodle to get a building warrant and not even ****ing close to being detailed enough to build off it!
If we’d continued as we were apparently our foundations would have cracked in several different places and for different reasons!!
So luckily we’re dealing with an incompetent quarry ( who knew that was a silver lining ) otherwise we might have poured concrete over poorly constructed and wrong size & configuration of metal work! So now Bob is trying to get hold of MD of the engineering firm to find out where the drawings we actually need are!
If they haven’t done them and try and wriggle out of it and we get the drawings done by someone else . It could take 3 weeks.
I don’t even want to think about the potential money we may or may not have wasted!!!
Builder that would like to go play in the garden.