25-07-2020, 03:24 PM
Tumbling pots out again. Staging being installed.
Now level and square. Now have to put straining wires along both roof sides before returning pots to GH. Lunch and rain stopped play, not because we'd get wet but because of the need for rain water management, i.e. pumping water around.
[attachment=833]
Now level and square. Now have to put straining wires along both roof sides before returning pots to GH. Lunch and rain stopped play, not because we'd get wet but because of the need for rain water management, i.e. pumping water around.
[attachment=833]